Zoho Sprints

Swimlane

A swimlane in Zoho Sprints is a horizontal row on the scrum board that groups cards by a chosen attribute such as assignee, epic, or priority to improve board readability.

Feature

A swimlane in Zoho Sprints is a horizontal band on the scrum board that organises sprint cards into groups based on a selected field, such as assignee, epic, or story type, making it easier to track workload and spot bottlenecks by category.

How Swimlane Works in Zoho Sprints

In Zoho Sprints, swimlanes are toggled from the board view settings. Once enabled, the board divides into horizontal rows, each representing a unique value of the chosen grouping field. Cards belonging to each group sit within their lane and still move across the status columns as work progresses. The combination of vertical status columns and horizontal swimlanes creates a grid that lets the team scan both individual workload and overall sprint status simultaneously.

When to Use Swimlane

Swimlanes by assignee are useful during standups for teams with five or more members where the default board view becomes crowded. Swimlanes by epic help product owners quickly see which feature area is progressing and which is stalled. Teams in India working on multiple client projects within the same sprint use swimlanes by tag or epic to separate client-specific work on a single board view.

Key Considerations

Too many swimlanes with only one or two cards each defeats the purpose and makes the board harder to read. If a team has more than eight lanes, consider splitting the project or filtering the board view instead. Swimlanes do not affect how work is tracked or how the burndown is calculated; they are purely a visual aid.

India Example

A Pune-based digital agency runs a sprint containing stories for two client projects alongside internal infrastructure work. They enable swimlanes grouped by epic in Zoho Sprints, creating three clear horizontal bands: one for each client and one for internal tasks. During the standup, the project manager instantly sees that the second client’s work has five cards stuck in the In Review column and assigns a senior developer to unblock the reviews.

What fields can be used to create swimlanes in Zoho Sprints?

Zoho Sprints supports swimlanes grouped by assignee, epic, priority, and story type, depending on the project configuration. The grouping option is available in the board view settings and can be changed at any time without affecting the underlying data.

Do swimlanes affect the burndown chart or velocity in Zoho Sprints?

No. Swimlanes are a board display setting only. They do not change how story points are counted, how the burndown chart is calculated, or how velocity is reported. Enabling or disabling swimlanes has no effect on any metric in Zoho Sprints.

Need help implementing this in Zoho?

Aaxonix is a certified Zoho implementation partner based in Pune. Architecture-first, no surprises.